Architectural review

Architectural review: approval for exterior work

Review the community standards, gather the required documents, and send in your Architectural Review Board (ARB) application before beginning exterior work.


Before you start

Ask first, then build

Any change to the outside of your home or lot goes to the Architectural Review Board first. The review keeps the neighborhood looking the way it did when you bought, and it protects you: the application form makes you responsible for removing work that was never approved.

Submission is not approval. Do not begin work until written approval has been provided.

Checklist

What to include with your application

Please prepare the following before you send your application:

A copy of the lot survey with the proposed alteration drawn on it. Required for all applications.
A legible sketch or drawing showing the location, size, type of construction, and dimensions.
Contractor information, if applicable.
Color swatches. For exterior painting, include the approved color scheme number from Exhibit H, Exterior Paint Color Schemes.
Pictures or samples that show the style and color you want and what it is made of.
A detailed description of the alteration, plus any other information needed to evaluate the request.

Has the alteration already been made?

A $100 fee must be included with an application submitted after work has been completed. Payment of the fee does not waive the community standards or guarantee approval.


Application

Send in your ARB application

The application is a printable form. Fill it in, sign it, and send it with your supporting documents to the Association Manager, who checks it for completeness before the Architectural Review Board (ARB) sees it.

1

Review the community standards

Read the standards that apply to your project before you fill anything in. Two things need no application: repainting in your existing colors, and replacing a dead plant with the same kind. Everything else outside the walls of the house does. The paint schemes are in Exhibit H, and fencing, mailboxes and signs each have an exhibit of their own.

Read the Standards
2

Download and print the application

The form is two pages. Page 2 is where you describe the alteration in detail.

Download the Application (PDF)
3

Fill it in and sign it

Complete every section. Every owner named on the deed must sign the application.

4

Gather your supporting documents

Everything in the checklist above, as PDF files or clear photos.

5

Email the whole packet

Scan the signed application and every supporting document as PDF files and send them in one email to the ARB mailbox, which the Association Manager checks:

modificationsavalonvillage@gmail.com

Prefer paper? Mail or drop off the packet at the Association Manager's office, 681 Oak Chase Blvd, Spring Hill, FL 34609, Attn: Architectural Review.


What happens next

After you submit

The Association Manager confirms your application has been received. The manager checks your packet for completeness, asks for anything that is missing, enters it into the association's management system (Vantaca), and then emails you that it is in the queue. If that email never arrives, the application has not reached the manager: send it again.

The ARB reviews it at its next meeting. The Architectural Review Board meets on the third Tuesday of each month, and complete applications go to the next meeting. The dates are on the community calendar.

The decision comes in writing right after that meeting. The ARB answers every application one of three ways: approved, approved with conditions, or declined. The letter goes out through Vantaca by email, or by mail if there is no email address on your application. The application form says to allow 30 to 45 days in all, which covers the wait for that meeting.

Start only when the approval letter is in hand. Work begun before then is treated as an after-the-fact application, which carries a $100 fee. An approval is good for six months; after that a new application is needed. If the ARB declines your plans, you may appeal in writing to the Board within 30 days.